extras: close lane (lead review), CP3 handed over; development pauses for CP1-CP3 findings
Co-Authored-By: Claude Fable 5.1 <[email protected]>
This commit is contained in:
1 parent
32925c8943
commit
bec1a370f9
3 files changed
+30
-3
No files matched your search
@@ -488,3 +488,14 @@ Findings:
|
||||
recorded so protocol §10.8 note 1 can mention it.
|
||||
|
||||
## Review
|
||||
|
||||
- 2026-09-16 (lead): inspected per `docs/loop.md` §5. Gates green run
|
||||
by me; diff limited to the brief's files and authorised edits plus
|
||||
three provisional lines in `ClipboardBridge.swift` (accepted: fixed
|
||||
strings and filenames only). Checked `CursorOverlay` is `@MainActor`
|
||||
and click-through, and that only `.awake` renews the assertion. QA
|
||||
PASS with one documentation follow-up (Windows pokes only when local
|
||||
input is idle), moved to TODO §10 with the lane's two open requests.
|
||||
Verdict: **merge**. **CP3 is now due.** The app is feature-complete
|
||||
against the PowerToys module minus README D6; lane 10 (polish) waits
|
||||
on the user's CP1–CP3 findings.
|
||||
+7
-2
@@ -160,8 +160,8 @@ Strictly one at a time, in this order (mirrors `TODO.md`):
|
||||
| 6 | app-engine | merged 2026-09-16 (one rework) |
|
||||
| 7 | app-ui | merged 2026-09-16 — **CP1 handed to the user** |
|
||||
| 8 | clipboard | merged 2026-09-16 — **CP2 handed to the user** |
|
||||
| 9 | extras | in progress — **CP3** |
|
||||
| 10 | polish | driven by the checkpoints' findings |
|
||||
| 9 | extras | merged 2026-09-16 — **CP3 handed to the user** |
|
||||
| 10 | polish | waiting on CP1–CP3 findings |
|
||||
|
||||
## 7. Escalations — things only the user can do
|
||||
|
||||
@@ -175,6 +175,11 @@ Strictly one at a time, in this order (mirrors `TODO.md`):
|
||||
|
||||
## 8. Lane log
|
||||
|
||||
- **2026-09-16, lane 9 (extras)** — Dev (Opus), QA (Sonnet) PASS with
|
||||
one documentation follow-up, lead merge. Second lane with no rework.
|
||||
The Dev verified corners and relative mode by reading and changed
|
||||
nothing there. Development pauses here: lane 10 needs the user's
|
||||
findings from CP1–CP3.
|
||||
- **2026-09-16, lane 8 (clipboard)** — Dev (Opus) found and fixed three
|
||||
of its own bugs on a re-read (duplicate in-band delivery across a
|
||||
peer pair's two connections, 22 000 chunks into a 512 outbox, Windows'
|
||||
|
||||
Reference in new issue
Block a user