Backlog triage: nine LSP-parity and plumbing gaps added to the plan

Cross-file references (rename can edit what references cannot list),
folding from the rainbow's own pair data, document highlight, inlay hints
for ordered connections, didChangeWatchedFiles, include/incdir
consumption, module hierarchy, semantic lint rules, CLI -f, hover macro
expansion. Milestone numbering fixed; triage checked off.

Co-Authored-By: Claude Fable 5 <[email protected]>
This commit is contained in:
lucioandClaude Fable 5 committed 2026-08-24 21:01:21 -07:00
1 parent 04be0cfb37
commit 6036a62784
1 file changed
+61 -3
+61 -3
View File
@@ -135,6 +135,53 @@ the work is reviewed**. Owner-priority items first (2026-08-24).
- [ ] **Rename module together with its file** (`module-filename` rule
agreement; needs LSP `workspace/willRenameFiles` plumbing)
### LSP-parity and plumbing gaps (lead triage, 2026-08-24 night)
Found by auditing the shipped capability set against the LSP end goal
(Pylance/ruff parity), the code's own "not shipped" notes, and what M1–M6
built but nothing consumes yet. Ordered by value ÷ cost:
- [ ] **Cross-file find-all-references** — `textDocument/references` is
still in-file only (nav.rs:50; vfmt-server README names it "not done"),
yet M2's rename already collects cross-file reference sets in
`vlog_refactor`. Rename can change what references can't even list.
Reuse M2's collection for the references answer — mostly wiring.
- [ ] **Folding ranges** — `pairs.rs` already computes every
begin/end/module/generate range for the rainbow; `foldingRange` is the
same data on a standard capability. Cheapest win on this list.
- [ ] **Document highlight** — cursor on a symbol highlights its other
occurrences; one `references_of` call, no new analysis.
- [ ] **Inlay hints for ordered connections** — `u (clk, rst_n, data)`
shows `.clk:`/`.rst_n:` ghost labels from the instantiated module's
definition (same index facts as M4); parameter names on ordered
`#(...)` overrides too. High everyday value in RTL review.
- [ ] **External file-change awareness** — the index rebuilds on save and
didOpen only; a `git pull`, an external edit, or editing the `.f`
filelist itself goes unnoticed until the next save. Register
`workspace/didChangeWatchedFiles` (sources + the filelist) and reindex.
- [ ] **`` `include`` navigation and `+incdir+` consumption** — M1 records
incdirs and nothing uses them; `` `include "x.svh" `` is not clickable
and the define table stays per-file. Document links (or definition) on
include lines, resolved through the filelist's incdirs, and a
cross-file define-table lookup along the include graph.
- [ ] **Module hierarchy** — "who instantiates X / what does X
instantiate", as LSP callHierarchy (modules as the nodes) or a custom
request the extension renders; the index already knows both directions.
- [ ] **Semantic lint rules** — unused-signal, undriven-net,
multiply-driven: TODO.md §7 calls this the differentiation Verible
cannot do, `vlog_semantic` has existed for rounds, and no semantic rule
ships yet.
- [ ] **CLI `-f` filelist flag** — the vfmt.toml `filelist` key and the
server consume M1's parser; `vfmt -f files.f` (format/lint exactly the
project's files) still does not exist.
- [ ] **Single-step macro expansion on hover** — the define-table README
promised it "later"; hover shows the body but expands nothing.
Already tracked elsewhere, deliberately not duplicated here: the
structural refactorings above, external waiver files, fuzzing, error-case
tests, component-level tests, CST losslessness round-trip, `insta`,
corpus-check CI wiring, `--diff-base`, salsa (TODO.md §4–6).
## Assumptions
- The semantic layer is the ground truth for "what references what".
@@ -196,8 +243,12 @@ commit — in order:
5. **M5 `completion-core`** — keyword + project-wide identifier completion
(token-harvested, comment/string-free), merged with M4's module
snippets; version bump to 0.3.0.
5. **Backlog** — the unchecked structural items above, re-planned when the
first four have soaked.
6. **M6 `completion-templates`** — context-gated statement/item snippet
templates; version 0.4.0. (0.4.1 hover-highlighting grammar and 0.4.2
color-decorator fix landed as owner-reported fixes, not milestones.)
7. **Backlog** — triaged 2026-08-24 night; next milestone is picked from
the LSP-parity list (cross-file references and folding first) unless
the owner reprioritizes.
## Status / TODO
@@ -209,10 +260,17 @@ commit — in order:
- [x] M4 refactor-instantiate — done, QA clean after one rework round, reviewed
- [x] M5 completion-core — done, QA clean first pass, reviewed
- [x] M6 completion-templates — done, QA clean first pass, reviewed
- [ ] Backlog triage after M6
- [x] Backlog triage after M6 — LSP-parity gap list added, 2026-08-24
## Work log
- **2026-08-24 (lead, backlog triage)**: Audited the feature list against
the shipped capability set. Nine gaps added under "LSP-parity and
plumbing gaps" — the standouts: references is still in-file while rename
is cross-file (M2's machinery makes the fix cheap), folding is free data
the rainbow already computes, inlay hints for ordered connections, file
watching, and the `+incdir+`s M1 records but nothing consumes. Milestone
numbering fixed (duplicate "5."). Nothing shipped was found mis-checked.
- **2026-08-24 (lead, end of day)**: M1–M4 all landed the same day, each
through the full dev → QA → rework → re-QA → lead-review loop (commits
315bbf2, 33f5819, e338524, 5785fd9). Every milestone needed exactly one